What changed forthree shippers.

The problem, what we changed and the numbers after. Companies and figures are fictional.

Truck on a highway
Kavera Auto Components · Auto components · Pune · fictional

Zero line stoppages in 14 months

Problem

Part-loads from Chakan to plants in Manesar and Hosur arrived 1–2 days late. Two assembly lines stopped twice a month waiting for brackets and harnesses.

Solution

Moved both lanes to dedicated 32 ft FTL on fixed daily slots. Added a cross-dock at Bhiwandi to merge supplier loads, with milk-run pickups from 9 vendors.

Result

97.5%On-time, up from 88%
−11%Freight cost per kg
0Line stoppages since go-live
Clean, empty warehouse floor
Medilane Pharma Distributors · Pharma · Ahmedabad · fictional

No temperature excursions across 2,300 loads

Problem

Vaccines and biologics moved in insulated boxes on general trucks. Three excursions in a quarter triggered a CDSCO-style audit finding.

Solution

Switched to 2–8 °C reefers with dual calibrated loggers, pre-cooled at our Bhiwandi cold room. Logger PDFs reach QA before unloading.

Result

0Excursions in 14 months
3/3Audits passed
−50%QA release time
Aerial view of a container yard
Rotex Engineering Exports · Engineering · Nashik · fictional

Port dwell cut from 6.2 to 2.4 days

Problem

Export containers waited at JNPT for slots and paperwork. Demurrage ran to ₹4.6 lakh a quarter and buyers in the Gulf flagged late arrivals.

Solution

Our customs desk pre-files shipping bills, books CFS slots 72 hours ahead and runs container trucking on our own fleet from Nashik to Nhava Sheva.

Result

2.4 daysAverage port dwell
−70%Demurrage cost
100%Sailings made in Q2

Got a bottleneck like these?

Describe it in two lines. We'll come back with a fix we've run before, and what it would cost.

Get quoteWhatsApp